Solid Waste Landfill Gas-to-Energy, Florida
Application:
In order for the site to meet their air permit requirements for the new power generation plant, the H2S levels must be treated to below 140 ppm. The facility was looking for an economical solution with minimal operator attention.
MV Solution:
After an extensive vetting process the facility selected a six-vessel H2SPlus System to treat up to 4,500 SCFM as required to meet the permit level of 140 ppm H2S. The system is expandable as the LFG production increases.
And, we're pleased to share that our partners on this project were recognized by ACEC/MN for their engineering achievement. View article here,"HR Green project named ACEC/MN Grand Award Winner"