Wastewater - Municipal Wastewater Treatment Facility (Wisconsin)

Project Description

Application:

Wastewater Treatment Plant Biogas

Flow Rate:

100 SCFM

H2S Treatment:

1,300-2,000 ppm down to < 50 ppm

Vessels:

Qty. 1; 8’D x 8’T

Completion Date:

April 2015

Municipal Wastewater Treatment Facility, Wisconsin

Application:

This facility was built with a cogen unit and requires both siloxane removal and H2S removal. The H2S removal is required for the GAC siloxane removal media to operate efficiently. The siloxane system required a maximum concentration of 50 ppm H2S.

MV Solution:

A single 8’ diameter x 8’ tall vessel with 294 ft3 of media treating the gas stream with 1,300 ppm, up to 2,000 ppm H2S, down to below 50 ppm.